
We accept advertising through Blogads. If you're interested, click the "Advertise here" link above, or go here to place your ad through Blogads. For assistance, e-mail me here; I'd be glad to help. Reach lots of viewers -- we're up to about 2,900 unique visits a day, and more than 53,000 page views a week (as of October 4). Our rates are dirt cheap for the exposure you'll get!
Robert Mondavi Solaire, Cabernet 2005
Castello Monaci, Liante, Salice Salentino 2006
Ricardo Santos, Malbec 2006
Quinta da Espiga, Tinto 2006
Charles Smith, Holy Cow Merlot 2006
Charles Smith, Boom Boom Syrah 2006
Charles Smith, The Honorable Pinot Gris 2007
Santa Rita, Cabernet Reserva 2005
King Estate, Pinot Gris 2007
Gloria, Douro, Tinto 2002
Bogle, Petite Sirah Port, Clarksburg 2005
Cardwell Hill, Pinot Noir 2004
Silkwood, Red Duet Cabernet-Syrah 2004
Portuga, Vinho Branco 2006, 2007
Osborne, Solaz 2004
Santa Rita, Cabernet, Reserva 2005
Penfold's, Koonunga Hill, Shiraz Cabernet 2006
Chateau Ste. Michelle, Cabernet, Indian Wells 2004
Chateau Ste. Michelle, Merlot, Horse Heaven Hills 2004
Hannah Nicole, Red 2004
Penfold's, Koonunga Hill Shiraz Cabernet 2005
Protocolo, Red 2005
Woodbridge, Chardonnay 2006
Portuga, Vinho Branco 2006
Beaulieu, Cabernet, Rutherford 1998
Beaulieu, Cabernet, Rutherford 1996
Kirkland, Roogle Shiraz 2004
Garda, Classico Chiaretto
A to Z, Oregon Pinot Gris 2005
I Giusti & Zanza, Nemorino 2006
Treana, Marsanne-Viognier, Central Coast 2005
Fife, Syrah, "Stanford" 2000
B.R. Cohn, Silver Label Cabernet 2005
Marques de Casa Concha, Cabernet 2005
Santi, Sortesele Pinot Grigio 2006
Al Muvedre, Tinto Joven 2006
Layer Cake, Shiraz 2006
Gritti, Ca' Andrea, Umbria red 2005
Altos de Luzon, Jumilla 2004
Thomas Leithner, Zweigelt 2004
Cain Cuvee NV 3
Chateau Ste. Michelle, Merlot 2003
Meridian, Sauvignon Blanc 2005
Canoe Ridge, Merlot 2003
Paringa, Shiraz 2005
King Estate, Pinot Gris 2005
Canoe Ridge, Merlot 2003
Maculan, Pino & Toi 2005
Kris, Pinot Grigio 2006
Silvan Ridge, Pinot Gris 2006
Fife, Mendocino Syrah, "Stanford" 2000
Castle Rock, Cabernet, Paso Robles 2005
Willakenzie, Pinot Gris 2006
The Show, Cabernet 2005
Essencia Valdemar, Rioja Rose 2006
Chateau Ste. Michelle, Merlot, Horse Heaven Hills 2004
Beaulieu Vineyard. Napa Valley Cabernet 2004
Irony, Cabernet, Napa Valley 2003
Rosenblum, Petite Sirah, Heritage Clones 2005
Fra Guerau, Montsant 2002
Barefoot Chardonnay
Kana, Syrah 2004
Castell Salegg, Chardonnay, Alto Adige 2004
Fetish, The Watcher Shiraz 2004
Gold Note, Fair Play Zinfandel 2005
Chateau Ste. Michelle, Canoe Ridge Estate Cabernet 2003
Ponzi, Pinot Noir 2004
Red Diamond, Merlot 2003
Mateus, Rose
Benton Lane Pinot Noir 2004
Penya Cadiella Vins de Comtat 2003
Kamiak, Cellar Select Red 2003
Anselmi, San Vincenzo 2005
Rubrato, Aglianico dei Feudi di San Gregorio 2004
Le Grand Noir (Black Sheep) Cabernet-Shiraz
Woodbridge, Chardonnay 2005
Los Vascos, Cabernet, Reserve 2004
Jackaroo, Shiraz 2003
Paul Jaboulet Aine, Crozes Hermitage Syrah, "La Jalet," 2001
Paul Jaboulet Aine, Cotes du Rhone, "Parallele '45,'" 2003
Rolf Binder, Barossa Valley Shiraz 2003
Oyster Bay, Sauvignon Blanc 2006
Woodbridge Chardonnay 2005
Barnard & Griffin, Columbia Valley Cabernet 2004
Quinto do Carmo, Alentejano Red 2000
Forefathers, Alexander Valley Cabernet 2001
Oscar Hijuelos - Mr. Ives' Christmas
Madeline L'Engle - A Wrinkle in Time
Steven Hart - The Last Three Miles
David Sedaris - Me Talk Pretty One Day
Karen Armstrong - The Spiral Staircase
Charles Larson - The Portland Murders
Adrian Wojnarowski - The Miracle of St. Anthony
William H. Colby - Long Goodbye
Steven D. Stark - Meet the Beatles
Phil Stanford - Portland Confidential
Rick Moody - Garden State
Jonathan Schwartz - All in Good Time
David Sedaris - Dress Your Family in Corduroy and Denim
Anthony Holden - Big Deal
Robert J. Spitzer - The Spirit of Leadership
James McManus - Positively Fifth Street
Jeff Noon - Vurt
Miles run year to date: 28
At this date last year: 102
Total run in 2007: 113
In 2006: 100
In 2005: 149
In 2004: 204
In 2003: 269
Comments (15)
Wow, I'm stunned something as realistic as that article was printed. Hopefully this is a sign that good things are coming out of City Hall. I get the feeling that more than former PDX occupants are reading this blog with interest.
And the cancellation fees can't be too high, can they Jack? I mean, I've seen multi-million dollar projects go away for under 15% and some lawyer-time. Given that this bad idea is a distraction for the City Council from doing something useful (read: attracting real companies back to PDX) that seems like the best (albeit "money for nothing") answer.
Posted by Scott_in_Japan | November 27, 2005 3:40 AM
There are several contracts that apparently compel the city to provide a tram, come hell or high water, no matter what the cost. "IGAs" or some such. And who knows what sorts of damages could arise under those?
I've asked to see them all. We'll see if I do.
It looks to me as though the fat cats up on Pill Hill are going to bankrupt the city. Chalk up another brilliant move by the city commissioners. Especially Sten and Saltzman, who were there from the beginning, but also Fireman Randy, who cast a few aye votes for the tram and should have known better.
Posted by Jack Bog | November 27, 2005 4:40 AM
I can see the movie now: “The Tram That Ate Portland”
Posted by bill mcdonald | November 27, 2005 7:51 AM
"...but also Fireman Randy, who cast a few aye votes for the tram and should have known better."
I plead guilty.
However, I live by the old saying
"Fool me once, shame on you.
Fool me twice, shame on me."
Since the day of the announced price increase to build the Tram, my advise to Commissioner Adams and Mayor Potter has been either the developers and OHSU eat the new and future price increases or we, the city, pull the plug on the project.
And no, I will not agree to spend urban renewal dollars or any other city controlled resource, general fund or otherwise, to subsidize the tram.
I also think it is open to further discussion whether or not we can cancel the tram and not be liable to OHSU for damages and/or harm the city's credit rating.
Posted by Randy Leonard | November 27, 2005 11:08 AM
But isn't the purpose of the Tram to provide an escape route for the nano-tech lab?
Posted by Abe | November 27, 2005 11:21 AM
...either the developers and OHSU eat the new and future price increases or we, the city, pull the plug on the project.
If we tell the Tram Local Improvement District (LID) participants they will continue to fund any and all future price increases, they can elect to kill the LID by withdrawing their support for it. (They've been counting it as a cheap funding mechanism.)In that case, they --not the City-- could be construed as pulling the plug. Can OHSU sue the city for not completing a project OHSU pulled the plug on? And couldn't the City then sue OHSU for consequential damages and whatever contracts the City was induced to enter as part of the LID process?
OHSU et al may have anticipated a cap on their "contribution" but life doesn't work that way, and if you want a showcase project that hasn't been done before, expect surprises. (In fact, didn't OHSU contribute to cost over-runs by forcing a change in the upper terminus location, creating tougher design issues?)
I'm encouraged that Sam is talking tough, along with Commissioner Leonard. Whether we're stuck with this project, or not, its important we protect the City from further cost over-runs on this project that seems to have less going for it the further along we go,
Posted by Frank Dufay | November 27, 2005 11:55 AM
Randy,
I genuinely appreciate your candor.
However, the Tram is indeed being funded in part by Urban Renewal. Funding which you voted for shortly after coming into office.
I suspect that is the "fool me once" event you referred to.
One of the most disturbing components of this unfolding story is who exactly fooled you.
I contend it is city staff at the planning department and PDC who is misleading public officials and the public at large.
The new revelations about the first OHSU building, for instance, did not come from city or PDC staff.
It should have. They knew the details. Instead that came from a couple private citizens, a good journalist and the WW.
Likewise when the PDC make the pitch for Trammel Crow Residential's "Alexan" tax abatement staff new the so-called affordable units did not include parking with the so-called affordable rent. They also knew the proposed rent had no real world subsidy as an outcome of the abatement. In fact the proposed so-called "subsidized" rent levels may have been above market rate for the small studios as presented.
But the PDC pitch that I witnessed misrepresented a gain of affordable housing in exchange for the multimillion dollar abatement approval.
I hear some retreats of sorts have been held with the Council and PDC.
I hope you are discussing the staff's lack of information or misinformation given to decision makers and the public.
Given today's information the Tram should either be mothballed or be funded solely by OHSU, the doctor's group and the voluntary LID only.
The true price tag is approaching the cost of replacing the entire Sellwood bridge, a vital transportation link used by with 34,300 vehicles a day. Until it's condition caused trucks and TriMet buses to be prohibited.
Posted by steve schopp | November 27, 2005 12:13 PM
To be clear, the city's original commitment was for a contribution through the urban renewal district. I knew that when I voted for it and I will continue to abide by that commitment.
I will not, however, agree to contributions to the Tram project beyond the city's original commitment.
My "fool me once..." comment is on the promises made that the last increase of the projected cost of the tram would be the last.
Posted by Randy Leonard | November 27, 2005 1:16 PM
Lyrics in the background: You gotta know when to hold 'em, know when to fold 'em...
Randy, you're starting to sound like a Portland taxpayer with your "fool me once" attitude. I like it.
Posted by Daniel Miglavs | November 27, 2005 6:11 PM
If OHSU really wants this tram, it should pay for it out of the Oregon Opportunity funds they scammed from us in 2002 (Measure 11). OHSU has $300 million from state-funded GO bonds to pay for this and other biotech capital projects. I believe OHSU's current ante on the tram is just $4 million which is likely budgeted from Oregon Opportunity funds. We (the taxpayers of Oregon) are all on the hook for repayment of these bonds. Let OHSU use this money for the tram if it wants it so bad. Then Portland can go about wasting my money on other projects.
Jack, I respectfully request that you learn about this. Oregon Opportunity project:
www.ohsu.edu/about/opportunity
Otherwise, it might be worth a Pulitzer for some enterprising WW or PortTrib scribe.
Posted by Molly | November 27, 2005 6:38 PM
All the OHSU tram project really needs for long-term success is the missing downhill ski run.
Posted by Allan L. | November 28, 2005 7:23 AM
This is beginning to remind me of that Simpsons episode where Springfield builds a monorail that blows up on its maiden voyage.
Posted by TOM | November 28, 2005 2:58 PM
Update: Governor Ted's 2005-2007 budget includes $32 million for debt service on the Oregon Opportunity Bonds, paid for with Tobacco Settlement proceeds. I believe the bonds will take approx 20 years to repay (which makes Oregon taxpayers obligated for at least $640 million to pay for $300 million in capital improvements on Pill Hill). Makes you long for the good old days of profligate spending of Sens Hatfield and Packwood.
Posted by Molly | November 28, 2005 3:14 PM
Oops! We're in for the debt service on $300 million, which will exceed $320 million from state budget (approx $32 million x 10 biennia), not $640 million.
Posted by Molly | November 28, 2005 3:43 PM
Commissioner Adams and Leonard (and the rest including PDC) should look at the Tram from a cost benefit analysis. The $45M tram plus a 15% building contingency amount (which the media leaves out, and most building industry experts say is a more realistic contingency for a project of this complexity) makes the hard cost total for the tram at $51.75M. Doing a 20 year life cycle cost analysis that includes costs for financing, depreciation, maintenance, operations, and land costs, the actual costs for the tram is at least $173,750,000.00 million dollars. A good share of it taxpayer dollars. That equals $65 dollars for each trip on the Tram. Compare that to a shuttle system of $2 to $3 dollars/trip. And remember that the shuttle system has to be inplace as a backup for bad weather and repair and maintenance days. Commissioners and PDC need to do a true life cycle costs of the tram. It is not too late. I'd recommend not having PDC do it for good reasons. Oh ya, I trust them, like when they intially told our neighborhood and city that the tram would be about $8.5M. Which the media reports the beginning price at $15M to $24M depending on who's reporting
Posted by Jerry | November 29, 2005 8:05 PM